Collaboration with Tata Projects Ltd.
Served as a sub-contractor on the CTP-13 Western Dedicated Freight Corridor Project (Sachin to Vaitarna stretch), undertaking railway bridge works, extensive earthwork, and GSB (Granular Sub Base) formation.
Construction of major and minor railway bridges: foundations, piers, abutments, and superstructure.
Large-scale earthwork operations, including embankments, soil stabilization, and cut-and-fill works.
Execution of GSB layers for formation, service roads, and approaches, ensuring load-bearing capacity and long-term durability.
Associated structural and allied civil works essential for the corridor.
Detailed surveying, alignment verification, and geotechnical investigations for soil suitability.
Advanced compaction and gradation control in GSB layers with modern mechanized equipment.
Precision bridge construction using formwork, staging systems, heavy cranes, and girder launching methods.
Strict quality monitoring with tests such as cube testing, density checks, and compaction verification.
Executed works as per DFCCIL and RDSO standards, ensuring structural safety and durability.
Achieved timely delivery of milestones under challenging site conditions.
Maintained zero-accident safety record with strong adherence to environmental guidelines.
Strengthened the Western Dedicated Freight Corridor (Sachin to Vaitarna), a vital segment of India’s logistics backbone.
Boosted freight efficiency and reduced congestion on passenger routes.
Supported regional industries by providing a faster, safer, and cost-effective freight rail system.
Diversified company capabilities beyond highways into mega-scale railway freight infrastructure.
Showcased expertise in bridges, earthwork, and GSB, reinforcing reliability as a sub-contractor.
Contributed to one of India’s most ambitious infrastructure projects, enhancing long-term industry credibility.