2023 to 2024

Collaboration with IRB Infrastructure Developers Ltd.

Worked as a sub-contractor on the IRB Expressway Project (Gandeva to Ena stretch), executing earthwork, subgrade formation, and allied works.

Scope of Work:
  • Large-scale earthwork and embankment formation along the expressway corridor.

  • Subgrade preparation involving soil stabilization, levelling, and compaction to meet pavement design standards.

  • Grading and site development for subsequent GSB and pavement layers.

Technical Execution:
  • Utilized advanced earthmoving equipment, graders, and vibratory rollers for precision.

  • Ensured subgrade quality through field density tests, moisture content checks, and soil compaction verification.

  • Adopted environmentally responsible methods for handling cut-and-fill operations.

Impact:
  • Strengthened the GandevaEna section of the expressway, improving regional and interstate road connectivity.

  • Facilitated smooth progression to higher pavement layers, ensuring long-term durability of the roadway.

Reputation:
  • Expanded the company’s technical portfolio with successful subgrade execution in addition to large-scale earthwork.

  • Reinforced standing as a reliable sub-contractor for national-level expressway developers like IRB.